ROLE-BASED ACCESS NOTE: The features and functionality described in this article require the assignment of either the Admin or DevOps user role to your user account. Without either of these roles assigned, some or all of the functionality may not be available to you.
Accessing the Work Scheduler
Sign into Aimably, open the Reduce navigation menu group and click on the Work Scheduler menu item on the left.
Selecting a Work Schedule to Update
Review the Work Schedule calendar to find the Work Schedule that you would like to update. Once you've found it, click on the body of the schedule item to pull up the configuration window.
For an explanation of navigating the Work Schedule calendar please view: Understanding the Work Schedule Calendar
Updating the Work Schedule Configuration
Once the configuration window is open for the selected Work Schedule, make your changes to your preferred fields, then click Update.
For a detailed explanation of configuration options please view: Configuring a Work Schedule